High Pressure Cement Head

High Pressure Cement Head

The High-pressure double plug cement head is the first cementing head designed by our company for ultra-deep wells and high-pressure wells. It can be widely used in deep well cementing and shale gas cementing fields.

SizeFrom 4-1/2″ to 13-3/8″
OriginShandong,China
CertificateAPI, ISO9001 2015
Loading PortQingdao/Tianjin China
Lead Time15-25 days

Description

 High-pressure double plug cement head is the first cementing head designed by our company for ultra-deep wells and high-pressure wells. It can be widely used in deep well cementing and shale gas cementing fields.

Specification

Size,  mm
Specifications, (in)
Φ139.7
(5½”)
Φ168
(6⅝”)
Φ177.8
(7″)
Φ194
(7⅝”)
Φ244.5
(9⅝”)
Φ273
(10¾”)
Φ339.7
(13⅜”)
Overall Length, mm 1460 150015501550175017501780
Manifold 2″Union 2″Union 2″Union 2″Union 2″Union 2″Union  2″Union
I.D. of Plug Container, mmΦ125Φ150Φ160Φ175Φ225Φ250Φ320
Length of Plug Container, mm400450450450550550600
Working Pressure, MPa35,5035,5035,5035,5035,503535 
  • 1.The cement head as a whole is not welded. All the joints of the components are designed with threaded connections + seals. Reliable pressure performance and easy maintenance. 
  • 2.The cement head is equipped with a rubber plug indicator. Convenient for the operator to understand the working status of the rubber plug
  • 3.The cement head is equipped with a large-pitch quick-connect device. Can achieve rapid installation and removal of the cement head.

High-pressure double plug cement head is the first cementing head designed by our company for ultra-deep wells and high-pressure wells.

It can be widely used in deep well cementing and shale gas cementing fields.

What is the size of Cement Head you can manufacture?

From 4 1/2″ to 20″.

After-Sales Service:
Provide considerate services to minimize clients’ worries.
(1) Assist clients to prepare for the first construction scheme;
(2) Install and debug the equipment;
(3) Train the first-line operators on site
(4) Examine the equipment regularly;
(5) Take initiative to eliminate the troubles rapidly at site;
(6) Distribute the guarantee fittings door-to-door
(7) Provide perfect service;
(8) Provide technical exchanging;
(9) Provide maintenance for big items.

Related Products:

Single Plug Cement Head High Pressure Cement Head
Top Drive Rotating Cement Head

What is your need? Price or Data Sheet? Contact us freely!

Choose Your Language